Waste water collection system, waste water treatment:

1- Good control: The on / off vale equipment is installed to bear if there is any problem of wastewater released from a certain enterprise to others without affecting on the operation of other businesses for the whole system. The below drawing is the principle drawing for making the waste septic tank.

2- During the constructed works:

Photo: A section of the septic tank of waste water having vales for closing/opening is under construction.

3- The actual works

Photo: The septic tank of waste water is covered with corrosion-resistant alloy

Photo: The septic tank of waste water is finished by making of reinforced concrete and covered with corrosion-resistant alloy.

 

Come back to:

  1. Factory size: … – View more
  2. Roofing zinc sheet and wall panels: … – View more
  3. Factory’s floor loaded capacity: … – View more
  4. Internal roads: … – View more
  5. Fire prevention and fighting system: … – View more
  6. Power/ Electrics Supply: … – View more
  7. Security System & Surrounding Fences: …- View more
  8. Rain water system: …. – View more
  9. Plantations and gardening: … – View more